Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2445.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 05, 2021     40-2 3 Flap Systems step 1-6 and 1-4 - (14 hours)       Category: Controls
Alignement of flap torque tube and flap crank. Clecoed using predrilled and matchdrilled 1/8. Bolted the flap crank to the torque tube and matchdrilled other holes installing second set of hardware.
Matchdrilled using the Jig. Everything went fine on one side, unfortunately second side something went wrong with the alignment. After consultation with VANS they reccommended to wait until final rigging as the problem may be resolve with the adjustments. In any case i ordered another torque tube and another flap crank
All the tubes have been primed internally.
Same process on both sides.


 